Current location: Home>Application
Reduce Higher Sulfur & Ash in Raw Coal,Solve Boiler Abrasion Problem in Power Plant
Abstract
2019,DIRO helped CGTEE GROUP build dry coal separation plant in candiota ii phase C power plant project in Brazil. This dry coal separation plant is the largest coal preparation project being built in China-Brazil coal beneficiation projects with capacity 3000000t/a. After completion,sulphur content and ash content of raw coal can be sharply reduced,greatly improve abrasion of boiler, and reduce the emission of dust.Bring considerable economic benefits to the power plant while striving to protect the local ecological environment.
Commissioning is finished in 2020,Feb.
● Introduction
The candiota ii phase C power plant project is located in Candeotta, Nandahe Prefecture, Brazil. This project is 350000 kilowatt generator set , and officially generated electricity in 2010.
● Problems of Old Project
During the operation of the power plant, there have always been the problems:
1. High stone content of raw coal
2. High sulfur content of raw coal
3. Lower calorific value than the quality of the designed coal
4. Leads to serious abrasion of the generator set and seriously affects on the safety and stable operation of the generator set.
● Find Solution
In order to solve the problems of poor quality of Coal Combustion in power plants, DIRO conducted technical exchanges with the owner of CGTEE and carried out repeated technical argumentation.Finally, technology of Dry coal separation is proposed to improve quality of raw coal.
Moreover, DIRO carried out the industrial test of dry coal separation for raw coal supplied to CGTEE power plant in Shenyang, Liaoning Province, China, coordinating with the owners of Brazilian CGTEE power plant, Brazilian CRM coal mine, Citic Construction, Shandong Electric Power Construction Co., Ltd., Zhejiang Electric Power Design Institute, Harbin Boiler Factory,
Under the witness of every party, the industrial test has achieved successful separating results.
● Solution
DIRO designed layout of FX- 48A dry coal separatorfor candiota ii phase C power plant project. FX series dry coal separation system are developed out in 1992.Dry Coal Preparation technology is the advanced technology in dry coal processing, works excellently in coal de-shaling and de-sulphurization in the world coal industrial,and has been widely installed in,Texas, South Africa,Russia,Ukrain,Poland,Turkey etc.
This dry coal preparation is installed to improve the quality of raw coal. It has the advantages below
1. Low investment,
2. Energy-saving and environmental protection,
3. It does not produce slime,
4. Especially suitable for coal de-shaling & de-sulphurization of thermal coal.
● Design of FX-48A dry coal plant
After the installation of the dry coal preparation plant, achieving :
1. The sulfur content and ash content of raw coal be greatly reduced
2. To improve the abrasion of boilers GREATLY,
3. To reduce the emission of dust,
4. To bring considerable economic benefits to the power plant while striving to protect the local ecological environment.
The supporting facilities are modular design, which is convenient for container transportation and installation, and the whole coal preparation plant is equipped with a highly automatic centralized control system.
● Manufacturing & Configuration
1. All equipment and supporting facilities are internationally famous brands;
2. Both manufacturing and construction are controlled according to the strictest ASME standards;
3. Dust removal system of upgrading equipment is designed with a new three-stage dust removal system and one more fine-coal briquetting system to avoid dust-raising in the production process;
4. Modular design for coal preparation plant is convenient for shipping and installation;
5. 3-D model database is built for coal preparation plant and equipment to improve working efficiency.
● Quality Control
Assurance scheme of product quality has been worked out. The manufacture of equipment is supervised by the professionals in the whole process, and strict inspection has been carried out before loading the factory.
● Presidents Comments
Brazil's president, Lula attended the ground-breaking ceremony and said, Dry Coal Preparation Plant of Candiota ii phase C power plant project is an singnificient project under "Belt and Road" initiative in South America.It's a model of economic and trade cooperation in the country.
With capacity of 3Mt/a, this is the large dry coal preparation plant with highest volume of export contract in recent years, even the largest coal preparation plant built by china company in south america.